
ROLLING: Riverina MP Michael McCormack, Committee 4 Wagga chairwoman Judy Galloway, councillor Yvonne Braid and Wagga City Council corporate services director Craig Richardson get the fire optic cable rolling in January. Picture: Wagga City Council
INACCURATE drawings have pushed the $1 million project to install CCTV along Wagga’s main street backs a month.
Numerous issues, including drawings available to work off were not an accurate reflection of the underground conduits along Baylis Street, caused the delay.
An additional 36 digs are needed to complete the installation within a 25-day timeframe.
The fibre optic cable will continue to be installed along Fitzmaurice and Baylis streets for security measures.